- Separate ownership, planning, servicing and physical site checks.
- A map is a starting point, not a buildability certificate.
- Give every unresolved assumption an owner and a next action.
Start a property evidence file
Collect the survey if available, parcel information, listing materials, existing drawings and known reports. Ask your lawyer to review title, easements, rights of way and acquisition conditions. Ask your design team what measurements and site information they require; do not treat approximate listing dimensions as design inputs.
Screen planning and physical constraints
Use Ottawa’s zoning map as an initial reference, then confirm the applicable provisions with the City and your planning adviser. Identify use, setbacks, height, site-specific provisions and overlays. Record the date and the version of the information used.
Walk the site with the right team. Discuss slope, drainage, neighbouring foundations, construction access, deliveries and space for staging. Identify trees early: protected trees may need separate permission before injury or removal. Heritage status may also affect proposed work and approvals.
Ask what services the project needs
Discuss the existing and required water, sanitary, storm, electrical and other utility connections. Request written clarification about capacity investigations, upgrades, connection responsibility and restoration of disturbed areas. A serviced street does not by itself tell you what the proposed building will require.
Write a go / investigate / stop memo
Use three columns: confirmed facts, assumptions needing evidence and unresolved conditions that could change the decision. For each open item, name who will investigate it, what evidence is needed and when you must decide.
Bring the site concept, approvals questions and preliminary cost categories into one review. The useful output is a list of decision-critical unknowns and the cost of resolving them—not a promise that a building will be approved.
A better first conversation.
- What may prevent the concept from fitting this property?
- Which constraints should become acquisition conditions for legal review?
- What evidence is missing about boundaries, servicing or existing conditions?
References & further reading
Source pages checked 21 October 2026. Requirements may change; confirm the rules for your property and scope.
Use these guides to prepare your questions. Confirm property-specific requirements, scope and pricing with your project team.